2015 Home Project Year

Samhain                                                                          Thanksgiving Moon

A father and son team came over Monday morning to do a site survey. Their task is to create a reliable internet connection between the modem and the garage. Might be wi-fi. Might be hardwired. Hardwired is the preference and that’s what they’ll work on first. Hopefully they can make all the ethernet jacks live at the same time. That would make positioning things in the future much more flexible. They’ll be back next Monday to work.

The kitchen remodel is on hiatus right now, waiting on the countertop’s creation and the arrival of various doors and a large cabinet injured in the first shipment. Kate’s got great ideas for color once the remodel is done. Slowly, slowly.

20151119_134627_001The December 29th date for switching on the solar panels has me a bit twitchy. The new rule promulgated by IREA (Intermountain Rural Electric Association) goes into effect on January 1st. It makes demand charges for peak load times, evenings here, so high that the result is solar panel investments will not pay out. IREA needs to install our net meter before January 1st for us to be grandfathered in under the old rules, rules that allow our solar investment to go positive in about 12 years. Having the same people in charge of installing our net meter who benefit if it’s done late doesn’t seem like the best thing, but it’s the way it is. And the 29th. So close.

Back to the fire mitigation today. I have some free time and warm weather has melted snow cover from downed trees I need to limb. This is an all winter project, taking advantage of various windows of acceptable weather conditions.

grandpop 300We’ve had a long string of projects this year. Makes sense since we’ve moved into a new house.  After 20 years in Andover we’d adapted 153rd Avenue to our peculiar needs and values. Now in some sense we’re starting over. Each step, the bookshelves in the loft, the generator install, the new gas lines, the new boiler, the new stickley table, sealcoating the driveway, fire mitigation work, solar panels, the new bed and tempurpedic mattress, the kitchen remodel and now the loft internet connection have met some priority or another.

A few, the generator, gas lines and boiler, were driven by necessity. The seal coating was timely. The bookshelves, the kitchen remodel and the solar panels on the other hand are projects designed to make our home more responsive to our values. The new bed and mattress made sense given aging bones and joints. The fire mitigation is necessary, but also enjoyable, something I can do.

We are in these ways becoming native to this place, learning its contours and possibilities and just as important, it’s limitations. Home. Black Mountain Drive. On Shadow Mountain.