Oh, pooh. Been awake thinking about building permits. This is something I’ve not spent any time thinking about before now. However, when Stefan asked if I had a building permit for the deck I said no. Didn’t think I needed one. (actually, didn’t occur to me. at all.) But, we’re selling the house next year.

We need a permit (I just checked) so I’m going to have ask Jon to stop working while I apply for one. This may put Jon out of the deck finishing since he needs to leave, probably before I can get a permit. Sigh. The number of things that come up during a move.

Anyhow, now that I’ve decided what to do (what was keeping me up was not knowing and therefore indecisive) maybe I’ll be able to get back to sleep. Or not.

The checklist of things to finish before March seems to grow longer. I’m not going to let this challenge my decision to enjoy the move and its various parts. Including learning about building permits. Something I suppose I should have learned by now, but I haven’t.