Emerging

Imbolc                                                                        Settling Moon II

The loft is slowly coming together. One section, the workout space, is close to its eventual configuration. It still needs the pull-up bar. After that it will be as I envisioned it. Doesn’t mean it won’t change after I use it for a while.

The books, as I’ve said before, are clustered and now await built-in bookshelves. As the bookshelves go up Ruth and I will organize them. All my art is, for now, still in boxes or rolled up in tubes. Until the wallspace is more defined, I’ll not be hanging or placing anything.

The IKEA standing desk still needs it work surface brought up from the garage. The twopieces are very heavy. Jon is going to build a round wooden table as a project space. He recommends Paxton Lumber as a source for the table top. This is a national chain owned by Bill Paxton’s family. (actor)

Storage space for office supplies is non-existent right now, so that’s a future project. Filing, which I thought I’d get started over the weekend, I’ll get to this week.

Aside from tweaks though, I’m ready to get back to a regular workout and translation schedule since the remaining work here will be some time in the realization.